Estimating & Pricing

2026 Standard
Rate Schedule

Effective January 1, 2026 Quotes Valid 30 Days USD · Ex-Works Cincinnati, OH
$350 Minimum Order Value
30 Days Quote Validity
1 Day Typical Quote Turnaround
Net 30 Payment Terms (Approved Accts)

Machining Services

Rates are per billable machine hour, portal-to-portal
Process Equipment Notes Rate / Hr
CNC Milling — 3-Axis Haas VF-4, VF-6 Standard vertical machining; up to 50" × 20" × 25" travel $138
CNC Milling — 4/5-Axis DMG MORI DMU 50 Simultaneous 5-axis, complex geometries, compound angles, undercuts $195
Multi-Task (Mill/Turn) Mazak Integrex i-200 Combined milling and turning in a single setup; reduces setups on complex parts $168
CNC Turning — Standard Okuma GENOS L-Series, Haas ST-30 2-axis turning; bar stock through 3.5" dia.; big-bore to 6" on ST-30 $112
CNC Turning — Live Tooling Okuma GENOS (Y-axis) Driven tooling, off-center features, cross-holes in a single op $135
Swiss-Type Machining Citizen Cincom L20 (×2) Parts to 20mm dia.; ±0.0002" capability; high-volume medical and connector runs $162
Wire EDM Mitsubishi MV1200 Profiles, slots, keyways in hardened material; ±0.0002" positional $145
Sinker EDM Sinker EDM w/ C-Axis Deep cavities, internal sharp corners, graphite electrodes included $158
Surface Grinding Blanchard / Reciprocating Flatness and parallelism; Ra as low as 8 µin achievable $98
Cylindrical Grinding OD/ID Cylindrical Journals, bores, tapers; tolerances to ±0.00005" on OD $118

Programming & Engineering

Billed in 0.25-hr increments; quoted up-front on complex programs
Service Rate
Mastercam CAM Programming — 3-Axis $115 / hr
Mastercam CAM Programming — 4/5-Axis $135 / hr
SOLIDWORKS DFM / Design Review $145 / hr
Tooling & Fixture Design $155 / hr
Setup Type Rate
Standard Setup (3-axis mill, lathe, grinder) $285 / setup
Complex Setup (5-axis, EDM, multi-task) $425 / setup
Lights-Out / Unattended Supplemental Fee $185 / setup
Re-Setup (customer design change after approval) Actual hrs

Inspection & Quality Documentation

All inspection performed in climate-controlled metrology room
Service Details Rate
CMM Inspection — Mitutoyo CRYSTA-Apex S Dimensional verification to print; includes PC-DMIS report $118 / hr
Optical Comparator — Keyence IM-Series 2D profile inspection; ideal for Swiss parts and thin features $95 / hr
Manual Dimensional Report Hand gauging and report for straightforward features $68 / hr
First Article Inspection — AS9102 FAI Package Balloon drawing, dimensional report, material cert, process certs $385 flat
PPAP — Level 3 Package Full Level 3 submission: design records, PFMEA, control plan, MSA, SPC $575 flat
Certificate of Conformance (C of C) Lot-level conformance statement; per purchase order line $45 / lot
Material Certifications (MTR handling) Receipt, review, and attachment of mill certs to job record $28 / lot

Material Policy & Markup

Customer-furnished material accepted with prior approval

Standard Materials

  • Aluminum (all alloys)+ 18%
  • Carbon & Alloy Steel+ 18%
  • Brass & Copper+ 18%
  • Delrin / Acetal+ 18%

Specialty Materials

  • Stainless Steel+ 22%
  • Titanium (all grades)+ 22%
  • Inconel / Superalloys+ 22%
  • PEEK & Eng. Plastics+ 22%

Customer-Furnished

  • Material markupNone
  • Receiving / inspection fee$38 / shipment
  • Scrap liabilityQuoted per part
  • Material cert requiredYes (AS9100D)

All material purchased to customer specification and drawing requirements. Certificates of conformance and material test reports retained per AS9100D lot traceability requirements. Exotic alloys (Hastelloy, Waspaloy, MP35N, etc.) quoted on market at time of order — contact our estimating team.

Finishing & Secondary Services

In-house where indicated; partner services quoted as pass-through + coordination
In-House Service Rate
Deburring / Edge-Break $78 / hr
Light Assembly & Sub-Assembly $92 / hr
Kitting & Special Packaging $68 / hr
Shipping / Freight Handling At cost + $35
Partner Finishing (Quoted Separately) Lead Time
Anodize — Type II (clear or color) 3–5 days
Anodize — Type III (hard coat) 4–7 days
Passivation (per AMS 2700 / ASTM A967) 2–4 days
Black Oxide, Nickel / Chrome Plating 3–6 days

Lead Times & Rush Pricing

Lead time starts from receipt of PO + approved drawings
Service Class Lead Time Premium
Standard 10–15 business days No premium
Priority 6–9 business days + 20%
Expedite 3–5 business days + 40%
Rush (subject to floor capacity) 1–2 business days + 75%

Minimums & Quantities

  • Minimum order value $350
  • No minimum quantity on prototypes or first articles
  • Production runs: 1–10,000+ pieces per order
  • Blanket POs and scheduled releases available
  • Volume pricing available at 50 pcs, 200 pcs, and 1,000+ pcs
  • Call us for multi-year agreement pricing

Standard Terms

Before you send your RFQ

Payment & Credit

  • Net 30 for approved trade accounts (credit application required)
  • New customers: credit card at order, or 50% deposit with balance on ship
  • Progress billing available on orders over $10,000
  • 2% per month on overdue invoices after 30 days

Quote & Order Policy

  • All quotes valid 30 calendar days from issue date
  • Prices subject to change if drawing revision occurs after quote
  • Material price adjustments applied if market changes exceed 10% at order time
  • Cancellation: pre-work and material costs billable after PO accepted

Quality & Liability

  • All work warranted to print at time of ship
  • Discrepancy claims must be filed within 30 days of receipt
  • Liability limited to replacement or refund of the defective lot
  • Customer-furnished material: Precision Machine not liable for inherent material defects

Full terms and conditions available at time of quote. ITAR-controlled work handled per Federal Acquisition Regulations; end-use certification required. All machined components remain property of customer; no proprietary data is retained beyond the scope of the job.

Ready to Get a Number?

Send us your print.
We'll send you a quote.

Most quotes back within one business day. No minimum quantity on prototypes.